Inventor · Leonidas, TX, US

John Ely

20Patents
6h-index
26Co-inventors
69Inventor score

Filing activity: Sep 16, 1977 → Jul 11, 2023

Most-cited inventions

PatentTitleAreaCited byStatus
US9771795B2 Microbiome based systems, apparatus and methods for the exploration and production of hydrocarbons Fixed Constructions 30 Active
US4210206A High temperature well treating with crosslinked gelled solutions Emerging Cross-Sectional Technologies 28 Expired
US6945327B2 Method for reducing permeability restriction near wellbore Chemistry; Metallurgy 27 Expired
US4265311A Methods of water flooding and fracturing using clean, non-damaging fracturing fluids Emerging Cross-Sectional Technologies 26 Expired
US4133383A Terminating the flow of fluids from uncontrolled wells Chemistry; Metallurgy 16 Expired
US10221660B2 Offshore methods of hydraulically fracturing and recovering hydrocarbons Emerging Cross-Sectional Technologies 7 Active
US10767476B2 Microbiome based systems, apparatus and methods for the exploration and production of hydrocarbons Fixed Constructions 5 Active
US10053967B2 High power laser hydraulic fracturing, stimulation, tools systems and methods Fixed Constructions 3 Active
US11047232B2 Microbiome based systems, apparatus and methods for the exploration and production of hydrocarbons Fixed Constructions 2 Active
US9828542B2 Methods of hydraulically fracturing and recovering hydrocarbons Emerging Cross-Sectional Technologies 2 Active
US10975691B2 Microbiome based systems, apparatus and methods for the exploration and production of hydrocarbons Fixed Constructions 1 Active
US11846172B1 Method for well re-stimulation with hydraulic fracture treatments Physics 1 Active
US11629593B2 Microbiome based systems, apparatus and methods for the exploration and production of hydrocarbons Fixed Constructions 1 Active
US9771784B2 Method for re-stimulating wells with hydraulic fractures Fixed Constructions 0 Active
US12286871B2 Method for preventing influx of fluid during fracturing of an offset well Fixed Constructions 0 Active
US11697976B2 Method for preventing influx of fluid during fracturing of an offset well Fixed Constructions 0 Active
US12044096B2 Method for plugging a wellbore allowing for efficient re-stimulation Fixed Constructions 0 Active
US10895126B2 Method for preventing influx of fluid during fracturing of an offset well Fixed Constructions 0 Active
US11448036B2 Method for preventing influx of fluid during fracturing of an offset well Fixed Constructions 0 Active
US10704356B2 Method for preventing influx of fluid during fracturing of an offset well Fixed Constructions 0 Active

Source: USPTO / EPO open patent data. Inventor disambiguation is heuristic; counts are objective bibliographic measures.