Ted A. Long
33Patents
8h-index
63Co-inventors
78Inventor score
Filing activity: May 18, 1999 → Jul 8, 2021
Most-cited inventions
| Patent | Title | Area | Cited by | Status |
|---|---|---|---|---|
| US6095196A | Tortuous path fluid pressure reduction device | Emerging Cross-Sectional Technologies | 55 | Expired |
| US6701957B2 | Fluid pressure reduction device | Emerging Cross-Sectional Technologies | 38 | Expired |
| US7661476B2 | Gravel packing methods | Fixed Constructions | 33 | Active |
| US7971642B2 | Gravel packing methods | Fixed Constructions | 25 | Active |
| US6935370B2 | Fluid pressure reduction device | Emerging Cross-Sectional Technologies | 23 | Expired |
| US7938184B2 | Wellbore method and apparatus for completion, production and injection | Fixed Constructions | 20 | Active |
| US8011437B2 | Wellbore method and apparatus for completion, production and injection | Fixed Constructions | 10 | Active |
| US7055548B2 | Control valve trim and seat design for valve trim with minimal unbalanced area | Emerging Cross-Sectional Technologies | 9 | Expired |
| US7066447B2 | Sleeve valve with adjustable flow characteristics | Emerging Cross-Sectional Technologies | 8 | Expired |
| US7013918B2 | Fluid pressure reduction device | Emerging Cross-Sectional Technologies | 8 | Expired |
| US8430160B2 | Wellbore method and apparatus for completion, production and injection | Fixed Constructions | 8 | Active |
| US8186429B2 | Wellbore method and apparatus for completion, production and injection | Fixed Constructions | 7 | Active |
| US8347956B2 | Wellbore method and apparatus for completion, production and injection | Fixed Constructions | 6 | Active |
| US10030508B2 | Method for monitoring gas lift wells using minimal concentration tracer materials | Physics | 5 | Active |
| US8356664B2 | Wellbore method and apparatus for completion, production and injection | Fixed Constructions | 4 | Active |
| US9593559B2 | Fluid filtering device for a wellbore and method for completing a wellbore | Fixed Constructions | 4 | Active |
| US8165816B2 | Fluid injection management method for hydrocarbon recovery | Fixed Constructions | 4 | Active |
| US11035201B2 | Hydrocarbon wells including electrically actuated gas lift valve assemblies and methods of providing gas lift in a hydrocarbon well | Fixed Constructions | 3 | Active |
| US9068447B2 | Methods for stimulating multi-zone wells | Fixed Constructions | 3 | Active |
| US10012059B2 | Gas lift optimization employing data obtained from surface mounted sensors | Mechanical Engineering; Lighting; Heating | 2 | Active |
| US9725989B2 | Sand control screen having improved reliability | Fixed Constructions | 1 | Active |
| US11180985B2 | Systems and methods for dynamic liquid level monitoring and control | Physics | 0 | Active |
| US11755795B2 | Detecting and mitigating flow instabilities in hydrocarbon production wells | Physics | 0 | Active |
| US11906689B2 | Hydrocarbon wells and methods for monitoring fracture morphology of a fracture that extends from a wellbore of the hydrocarbon wells | Physics | 0 | Active |
| US11255190B2 | Hydrocarbon wells and methods of interrogating fluid flow within hydrocarbon wells | Physics | 0 | Active |
Source: USPTO / EPO open patent data. Inventor disambiguation is heuristic; counts are objective bibliographic measures.