Timothy K. Ellison
6Patents
3h-index
21Co-inventors
53Inventor score
Filing activity: Feb 6, 2009 → Apr 22, 2020
Most-cited inventions
| Patent | Title | Area | Cited by | Status |
|---|---|---|---|---|
| US8914268B2 | Optimizing well operating plans | Fixed Constructions | 12 | Active |
| US9305121B2 | Method and system for modeling fractures in ductile rock | Physics | 9 | Active |
| US8190414B2 | Modeling of hydrocarbon reservoirs containing subsurface features | Physics | 8 | Active |
| US10415379B2 | Applications of advanced isotope geochemistry of hydrocarbons and inert gases to petroleum production engineering | Fixed Constructions | 2 | Active |
| US10533414B2 | Applications of advanced isotope geochemistry of hydrocarbons and inert gases to petroleum production engineering | Physics | 2 | Active |
| US11428079B2 | Material control to prevent well plugging | Fixed Constructions | 0 | Active |
Source: USPTO / EPO open patent data. Inventor disambiguation is heuristic; counts are objective bibliographic measures.