Power plant with integrated fuel gas preheating

US10006313B2 · kind B2 · utility

6Cited by
6References
9Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 27, 2014
Grant dateJun 26, 2018
Priority date
Expiry dateJan 26, 2037

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E20/16
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

The invention refers to a CCPP comprising a gas turbine, a water steam cycle with a steam turbine and a HRSG with at least two pressure levels, and a fuel preheater for preheating the fuel of the gas turbine. The fuel preheater includes a first heat exchanger for preheating the fuel to a first elevated temperature, which is connected to a feed water line from a pressure level of the HRSG, which is below the highest HRSG pressure level, and a second heat exchanger for further preheating the fuel gas to a second elevated temperature, which is connected to the high pressure feed water with the highest pressure level of the HRSG. The disclosure further refers to a method for operating a CCPP with such a fuel preheater.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.