Patent · US Active

Skip-mining type wangeviry stope branch roadway filling and coal mining method

US10012080B2 · kind B2 · utility

1Cited by
5References
2Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 19, 2014
Grant dateJul 3, 2018
Priority date
Expiry dateJan 29, 2035

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21C41/18
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A transportation main roadway and stope branch roadways are arranged by adopting a wangeviry coal mining method. A plurality of stope branch roadways are divided into multiple mining stages, based on which the stope branch roadways are skip-mined; and coal pillars are not reserved among the stope branch roadways. The transportation main roadway is a main transportation channel, and the stope branch roadways are coal mining roadways. All the stope branch roadways are sequentially stoped in a skip-mining manner according to the designed mining sequence and are sequentially and timely filled. The coal never stoped or the filled stope branch roadways is/are used as supports for controlling roofs at the two sides of the stope branch roadways, and the stope branch roadways are sequentially stoped according to a plurality of mining stages, and finally the coal pillar-free mining is realized.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.