Patent · US Active

Adaptive scheduling and orchestration in a networked environment

US10015278B2 · kind B2 · utility

0Cited by
1References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 11, 2015
Grant dateJul 3, 2018
Priority date
Expiry dateApr 4, 2036

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04L67/1008
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

A method, a device, and a non-transitory storage medium to receive a job request to schedule an execution of a process in a networked environment; generate a schedule for the execution of the process based on one or more current schedules directed to concurrent execution of one or more other processes; obtain resource utilization data indicating resource usage stemming from the concurrent execution of the process and the one or more other processes; analyze the resource utilization data; determine whether a resource inefficiency occurred during the concurrent execution based on an analysis of the resource utilization data; generate resource inefficiency data in response to a determination that the resource inefficiency occurred; and generate an adapted schedule for at least one of the process or the one or more other processes in response to a determination that the resource inefficiency occurred.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.