Production planning apparatus and production planning method
US10037018B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jan 27, 2016 |
| Grant date | Jul 31, 2018 |
| Priority date | — |
| Expiry date | Oct 16, 2036 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06395
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Provided is a production planning apparatus including: a storage unit configured to store: actual performance information on a resource required for production; a planning master including a plan of a resource required for work of the production; and a planning parameter including a variable required for a production plan; a parameter generation processing unit configured to change the plan of the resource required for the work, which is included in the planning master, based on a difference between the plan of the resource, which is included in the planning master, and actual performance of the resource required for the production, which is included in the actual performance information, and change the planning parameter based on how greatly the planning master is changed; and a production plan processing unit configured to calculate a production plan that uses the planning master and the planning parameter.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.