Patent · US Active

Maintenance schedule optimization method for electric power system including large-scale wind power

US10037502B2 · kind B2 · utility

1Cited by
0References
2Claims
0Family size

Assignees

Inventors

Key dates

Filing dateApr 2, 2014
Grant dateJul 31, 2018
Priority date
Expiry dateAug 28, 2035

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S10/50
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

The present invention discloses a maintenance schedule optimization method for an electric power system including large-scale wind power to build objective function to make it get optimal results, then constrain the objective function, constraint conditions include: constrain according to maintenance natural environment; constrain according to maintenance time of wind power plant; constrain according to maintenance site of wind power plant; constrain according to system reliability at wind power plant; constrain according to maintenance continuity of generator unit. Under the above constraint conditions, the electric power system is modeled with heuristic algorithm according to the above objective function. Through modeling the electric power system including large-scale wind power, optimize maintenance time of wind turbines in electric power system through modeling under a certain constraint conditions to maintain the wind power equipment properly while ensuring maximum efficiency of wind power generation at the same time.