Participation factor based method for resynchronization of microgrids
US10044192B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Feb 5, 2016 |
| Grant date | Aug 7, 2018 |
| Priority date | — |
| Expiry date | Aug 29, 2036 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY04S10/30
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
A microgrid is re-synchronized to a main grid or substation by determining a degree of bus angle or frequency mismatch and bus voltage mismatch between the microgrid and the main grid or substation prior to re-synchronization, determining an amount of power adjustment needed to reduce the bus angle or frequency mismatch and bus voltage mismatch to below respective predetermined thresholds, determining at least one participation factor for each microgrid bus, each participation factor indicating an amount of influence power injection by the corresponding bus has on the bus angle or frequency mismatch or on the voltage mismatch, allocating the amount of power adjustment to the microgrid buses in proportion to the participation factors assigned to the buses, and re-synchronizing the microgrid to the main grid or substation responsive to the bus angle or frequency mismatch and bus voltage mismatch satisfying the respective predetermined thresholds.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.