Patent · US Active

Managing resources in a configurable computing environment

US10061621B1 · kind B1 · utility

3Cited by
2References
30Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 13, 2018
Grant dateAug 28, 2018
Priority date
Expiry dateApr 13, 2038

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2209/5022
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

In one example, a system can receive configuration data indicating how resources can be combined, identify availability data indicating the total number of various resources that are available, and determine maximum-capacity data using the availability data and the configuration data. The system can also receive distribution data having probability distributions for jobs to be implemented using the resources, determine capacity valuations using the distribution data and the availability data, and determine a configuration of resources using the capacity valuations and the maximum-capacity data. Thereafter, the system can receive a job and determine that a valuation for the job exceeds a predefined threshold associated with using the configuration of resources. In response to determining that the valuation exceeds the predefined threshold, the system can assign the resources to the job in the configuration. The system can then cause the job to be performed using the configuration of resources assigned to the job.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.