System for the reduction in applied energy, improved efficiencies and reduced costs in open pit mining

US10082025B2 · kind B2 · utility

3Cited by
16References
18Claims
0Family size

Assignee

Inventor

Key dates

Filing dateFeb 26, 2015
Grant dateSep 25, 2018
Priority date
Expiry dateJul 28, 2035

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21C41/26
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

The present invention relates to an open pit mining system. The system includes a material lifting machine configured to both: (1) excavate and remove overburden from an open pit of a mine; and (2) excavate and remove valuable material from the open pit. Advantageously, the machine removes the overburden waste material as well as the mined valuable material which would otherwise be conventionally removed by trucks in the pit, out of the pit up the ramps and then onto the processing plant. Accordingly, the use of trucks for transporting valuable material both along and up out of the pit is at least to some extent reduced thereby resulting in improved cost and energy efficiency.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.