Patent · US Active

Systems and methods to improve shut-down purge flow in a gas turbine system

US10082091B2 · kind B2 · utility

0Cited by
5References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 25, 2016
Grant dateSep 25, 2018
Priority date
Expiry dateDec 22, 2036

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E20/16
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A system includes a controller of a power generation system including a memory storing instructions and a processor that executes the instructions. The instructions cause the controller to control the power generation system to provide inlet bleed heat flow to a gas turbine during deceleration of the gas turbine. The instructions also cause the controller to receive a first temperature, a rotational speed of the gas turbine, and an inlet bleed heat flow rate. Additionally, the instructions cause the controller to calculate an exhaust flow rate based on at least the first temperature, the rotational speed, and the inlet bleed heat flow rate. Further, the instructions cause the controller to control the power generation system to isolate a fuel source from the gas turbine at a portion of normal operating speed of the gas turbine sufficient to achieve a purging volume during coast down of the gas turbine.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.