Patent · US Active

Objective based backup job scheduling

US10083094B1 · kind B1 · utility

16Cited by
3References
21Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 23, 2015
Grant dateSep 25, 2018
Priority date
Expiry dateOct 18, 2035

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2201/865
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method and apparatus for scheduling backup tasks on a source system specified by a backup job to meet a recovery point objective (RPO) specified for the backup job is presented. A method generally includes estimating resource utilization at the source system expected during a plurality of time periods based on historical resource utilization by jobs executed on the source system. The backup system estimates a time required to complete the backup tasks during each time period on the source system based on the estimated resource utilization for each time period and historical backup performance data. Upon determining that the estimated time required to complete the backup tasks for one or more of the time periods meets the RPO, the backup system schedules the backup tasks to be executed during a time period of the one or more time periods with the lowest estimated resource utilization.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.