Patent · US Active

Managing multiple tasks of a project plan via a task management tool

US10095999B2 · kind B2 · utility

0Cited by
7References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 18, 2014
Grant dateOct 9, 2018
Priority date
Expiry dateMar 18, 2037

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/0635
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Systems, methods, and other embodiments for providing management of tasks of a project plan associated with a computer application are described. In one embodiment, a task management tool is disclosed that is configured to generate a task rectangle for display in a task management view. The task rectangle is representative of a task of the project plan in a Cartesian plane format having two attribute axes. An attribute indicium is also generated for display at a first position within the task rectangle as determined by the intersection of two attribute values of the first task on each of the two attribute axes, respectively. At least one of the two attribute values may be modified by re-positioning the attribute indicium at a second position within the task rectangle. The two attribute values take on two attribute axes values of the Cartesian plane format that intersect at the second position.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.