Patent · US Active

Method for reservoir evaluation employing non-equilibrium asphaltene component

US10100638B2 · kind B2 · utility

2Cited by
11References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 19, 2015
Grant dateOct 16, 2018
Priority date
Expiry dateApr 18, 2037

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B49/0875
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

The present disclosure relates to a method for characterizing a hydrocarbon reservoir of interest traversed by at least one wellbore that includes (a) using a numerical model to simulate over geological time a non-equilibrium concentration of an asphaltene component as a function of location within the wellbore, (b) analyzing fluid samples acquired from at least one wellbore that traverses the reservoir of interest to measure concentration of the asphaltene component as a function of location within the wellbore, (c) comparing the non-equilibrium concentration of the asphaltene component as a function of location within the wellbore resulting from the simulation of (a) to the concentration of the asphaltene component as a function of location within the wellbore as measured in (b), and characterizing the reservoir of interest based upon the comparing of (c).

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.