Patent · US Active

Incorporating a load change penalty in central plant optimization

US10101730B2 · kind B2 · utility

35Cited by
78References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateFeb 27, 2015
Grant dateOct 16, 2018
Priority date
Expiry dateDec 6, 2035

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S20/222
  • WIPO fieldControl
  • WIPO sectorInstruments

Abstract

An optimization system for a central plant includes a processing circuit configured to receive load prediction data indicating building energy loads and utility rate data indicating a price of one or more resources consumed by equipment of the central plant to serve the building energy loads. The optimization system includes a high level optimization module configured to generate an objective function that expresses a total monetary cost of operating the central plant over the optimization period as a function of the utility rate data and an amount of the one or more resources consumed by multiple groups of the central plant equipment. The optimization system includes a load change penalty module configured to modify the objective function to account for a load change penalty resulting from a change in an amount of the building energy loads assigned to one or more of the groups of central plant equipment.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.