Optimal wind farm operation
US10161386B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 12, 2016 |
| Grant date | Dec 25, 2018 |
| Priority date | — |
| Expiry date | Dec 22, 2036 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02E10/72
- WIPO fieldEngines, pumps, turbines
- WIPO sectorMechanical engineering
Abstract
The present application is concerned with a flexible way of operating a wind farm with a plurality of degrading wind turbine components. According to the invention, maintenance scheduling and power production in the wind farm are handled concurrently in a single optimization step. Instead of a serial approach first scheduling maintenance activities and subsequently adapting the power production and/or wind turbine operation the two aspects are optimized together. The wind farm operation takes maintenance aspects into account by adapting life index or health status based on modeled mechanical and electrical stress. Accordingly, the wind farm owner may decide when and how much energy to produce accepting which level of stress to the turbine equipment. The proposed optimization of wind farm operation includes all aspects of transmission network operator settings, the topology of wind farms and the underlying collector grid, the short and long term wind conditions forecasts, the conditions of the turbines, the estimated remaining operational time under different usage patterns and times, as well as aspects of the electricity market.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.