Aircraft non-periodic maintenance scheduling system
US10163078B2 · kind B2 · utility
1Cited by
33References
20Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Jun 30, 2016 |
| Grant date | Dec 25, 2018 |
| Priority date | — |
| Expiry date | Aug 5, 2036 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG08G5/20
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
A system aggregates data related to a non-conformance system in an aircraft and allocates resources to repairing the non-conformance condition. The system includes a service bus that receives and distributes the non-conformance condition and an optimizer tool that generates repair alternatives. The optimizer tool allows dynamic reconfiguration of rules to activate and deactivate or change a weight of individual rules in a rule set.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.