Signal and power transmission in hydrocarbon wells

US10175377B2 · kind B2 · utility

1Cited by
5References
34Claims
0Family size

Assignee

Inventor

Key dates

Filing dateFeb 11, 2011
Grant dateJan 8, 2019
Priority date
Expiry dateMar 18, 2031

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY10T29/49117
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

One aspect relates to a method of installing a transmission system in a hydrocarbon production well. The transmission system is operable for transmitting power and/or control signals down the well or for transmitting data signals back up the well. The well comprises a main well bore, a production tubing inside the main well bore and a branch off the production tubing. The branch comprises a side track tubing. The method includes: providing a sensor and/or load assembly in the branch; installing a first inductive coupler of an induced current transmission arrangement around the production tubing in the main well bore, and connecting the sensor/load assembly to the first inductive coupler via a communication link. Another aspect relates to a hydrocarbon production well installation.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.