Patent · US Active

Method of managing petro-chemical reservoir production and program product therefor

US10176538B2 · kind B2 · utility

1Cited by
8References
11Claims
0Family size

Assignees

Inventors

Key dates

Filing dateJun 30, 2015
Grant dateJan 8, 2019
Priority date
Expiry dateMar 11, 2037

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG01V2210/66
  • WIPO fieldMeasurement
  • WIPO sectorInstruments

Abstract

A method and computer program product for managing hydrocarbon field production, e.g., petro-chemical reservoir production. The hydrocarbon field is modeled using the finite volume method (FVM) model and the finite element method (FEM). Centroids are located in each FVM cell and each FEM element and overlapping cells are identified. After determining the distance between centroids for overlapping cells, fluid characteristics are mapped to the FEM element centroids, weighted inversely for distance between the respective centroids. A permeability/conductivity weighted average is determined for pore pressure and temperature of sub-volumes clustered around each FEM element node. Field production may be adjusted in response to FEM element node characteristics.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.