Method for low load operation of a power plant with a once-through boiler
US10196939B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jul 23, 2015 |
| Grant date | Feb 5, 2019 |
| Priority date | — |
| Expiry date | May 16, 2036 |
Classification
- Technology area (CPC F)Mechanical Engineering; Lighting; Heating
- CPC primaryF22D1/32
- WIPO fieldEngines, pumps, turbines
- WIPO sectorMechanical engineering
Abstract
The once-through boiler includes a water supply and at least an economizer, an evaporator superheater. No valves are provided between the economizer, the evaporator and the superheater. The high-pressure turbine includes a control valve. The method for low load operation of a power plant with a once-through boiler and a high pressure turbine includes providing a parameter indicative of the stable operation of the once-through boiler in once-through operation, and on the basis of this parameter adjusting the control valve in order to regulate the pressure within the economizer and evaporator and/or adjusting the temperature of the water supplied to the economizer.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.