Workload migration across a hybrid network
US10200471B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 19, 2018 |
| Grant date | Feb 5, 2019 |
| Priority date | — |
| Expiry date | Mar 19, 2038 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04L67/5681
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
A method and system for workload migration across a hybrid network is provided. The method and system are directed to migrating a workload to a cloud by transferring the workload computing processes to the cloud, streaming workload data as necessary to execute the workload processes in the cloud, transferring the remaining workload data in a background process to cloud storage, and then completing migration by switching the primary data source of the workload computing processes to the cloud storage. In another aspect, a method and system are directed to migrating on-premises storage associated with a virtual machine to the cloud to be stored and executed in association with containerized applications. Additionally, techniques for full detach and partial detach of containerized applications are provided.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.