Patent · US Active

Workload migration across a hybrid network

US10200471B2 · kind B2 · utility

2Cited by
2References
24Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMar 19, 2018
Grant dateFeb 5, 2019
Priority date
Expiry dateMar 19, 2038

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04L67/5681
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

A method and system for workload migration across a hybrid network is provided. The method and system are directed to migrating a workload to a cloud by transferring the workload computing processes to the cloud, streaming workload data as necessary to execute the workload processes in the cloud, transferring the remaining workload data in a background process to cloud storage, and then completing migration by switching the primary data source of the workload computing processes to the cloud storage. In another aspect, a method and system are directed to migrating on-premises storage associated with a virtual machine to the cloud to be stored and executed in association with containerized applications. Additionally, techniques for full detach and partial detach of containerized applications are provided.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.