Patent · US Active

Methods and apparatus to track changes to a network topology

US10210258B2 · kind B2 · utility

0Cited by
4References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 23, 2017
Grant dateFeb 19, 2019
Priority date
Expiry dateOct 23, 2037

Classification

  • Technology area (CPC H)Electricity
  • CPC primaryH04L41/0869
  • WIPO fieldDigital communication
  • WIPO sectorElectrical engineering

Abstract

Methods and apparatus to track network topology changes are disclosed. An example apparatus includes machine readable instructions, and a processor to execute the instructions to perform operations. The operations include, in response to a reporting message generated by a software defined controller containing topology change information corresponding to a topology change event scheduled to occur at a future time, store, in a topology database, a pre-validation data record reflecting the occurrence of the topology change event. The pre-validation data record indicates the occurrence is not validated. In addition, a validation seeking message is generated to validate occurrence of the topology change event and is transmitted to a network device to be subject to the topology change event after the future time. In response to a validation message from the network device, a post-validation data record is stored in the topology database.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.