Patent · US Active

Scheduling manufacturing jobs

US10222789B2 · kind B2 · utility

2Cited by
3References
12Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 30, 2014
Grant dateMar 5, 2019
Priority date
Expiry dateJul 8, 2034

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/80
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Scheduling of manufacturing jobs is described herein. In accordance with an example, the scheduling of manufacturing jobs includes obtaining an order parameter associated with a product to be manufactured on a manufacturing equipment set. A product dimension of an intermediate product for the product is determined based on the order parameter and a production attribute. Further, the manufacturing job is scheduled for the product amongst manufacturing jobs for other products to be manufactured on the manufacturing equipment set, based on the product dimension of the intermediate product and a scheduling criterion. The scheduling criterion can be a parameter to regulate the scheduling of the manufacturing jobs on the manufacturing equipment set.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.