Patent · US Active

Simulating a large network load

US10229230B2 · kind B2 · utility

0Cited by
11References
3Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 6, 2015
Grant dateMar 12, 2019
Priority date
Expiry dateSep 30, 2036

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2119/06
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A SAN testing application may be provided to restrict the utilization of one or more SAN device resources. The restricted, or throttled, resource(s) enables a smaller load to stress a SAN switch to effectively emulate a larger load. Resource throttling may, for example, result in the rapid filling of switch buffers and corresponding computational stress. The emulated load allows for all ports of a SAN switch to be simultaneously tested without the need or expense of a large number computing devices stressing the SAN. The SAN device with throttled resource(s) may be located within a testing environment or may be located in a functioning SAN to determine SAN bottlenecks prior to critical loading.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.