Strut linkage for a steel construction, and steel construction having a strut linkage
US10233662B2 · kind B2 · utility
Assignees
Inventors
Key dates
| Filing date | Aug 21, 2015 |
| Grant date | Mar 19, 2019 |
| Priority date | — |
| Expiry date | Aug 21, 2035 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P70/50
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A strut linkage for a steel construction may involve a tower of a wind turbine and/or a corner post of a lattice tower. In order that high forces can be removed via the strut linkage without causing increased stress concentrations, excessive use of material, and/or an excessive structural outlay, a plate element is provided for arranging between, preferably load-bearing, steel construction components. At least one connection element, which may be connected to the plate element, may be utilized to fasten at least one strut and/or guy of the steel construction to the steel construction components via the plate element.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.