Patent · US Active

Method for determining wiring risk and wiring risk determination system

US10248629B2 · kind B2 · utility

0Cited by
2References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 20, 2013
Grant dateApr 2, 2019
Priority date
Expiry dateJan 31, 2036

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/0635
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method for determining a wiring risk is a method for determining a first risk that electric wires connected to a plurality of terminal devices are bundled into a single harness, and a second risk that harnesses fail at the same time, wherein the first risk is determined by identifying the number of connectors to which a target harness identified from the plurality of harnesses is indirectly connected, and the second risk is determined by matching location information of the target harness to an influenced area by a hazard source, and identifying whether the target harness passes through the influenced area.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.