Patent · US Active

Two-part job scheduling with capacity constraints and preferences

US10261837B2 · kind B2 · utility

9Cited by
29References
30Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 29, 2018
Grant dateApr 16, 2019
Priority date
Expiry dateJun 29, 2038

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02D10/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Exemplary embodiments relate to the problem of allocating a finite number of units of a resource among requestors willing to offer different amounts of value for the resource. When different classes of requestors are permitted to cancel the request or fail to show up to collect the unit of the resource with different probabilities (collectively referred to as “wash”), the problem becomes difficult to solve efficiently. According to the procedures described herein, the capacity is artificially inflated to offset the impact of wash, and then protection levels are computed using the inflated capacity as if there was no wash. The capacity is then artificially inflated again based on the new protection levels, and the process is repeated until, e.g., the results converge. Using this procedure, overallocation limits and protection levels can be computed in real-time, and accordingly the resource can be allocated efficiently as new requests are received.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.