Production system having constraint evaluator generating constrained sequences

US10295992B2 · kind B2 · utility

0Cited by
4References
10Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 8, 2015
Grant dateMay 21, 2019
Priority date
Expiry dateSep 12, 2036

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/02
  • WIPO fieldControl
  • WIPO sectorInstruments

Abstract

A method for configuring a manufacturing plant includes generating a set of initial production schedules for manufacturing an entity, determining a set of consistent production schedules given each of the initial production schedules, selecting an instance of the consistent production schedules, generating a schedule for manufacturing instances of the entity, and operating the manufacturing plant using the schedule.