Correlating test results variations with business requirements
US10296448B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Nov 19, 2014 |
| Grant date | May 21, 2019 |
| Priority date | — |
| Expiry date | Nov 19, 2034 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/3692
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A method, system, and computer program product for relating test data to business requirements are provided in the illustrative embodiments. a test operation of a code is configured in a test data processing environment, a section in the code corresponding to a portion of a business requirements document. A set of baseline results is received. The test operation is executed, identifying the section of the code and associating the section of the code with a test result produced from the test operation. A determination is made whether the test result matches a first baseline result from the set of baseline results within a tolerance. When the test result does not match the first baseline result from the set of baseline results within the tolerance, the portion of the business requirements document is annotated.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.