Content centric cross-layer scheduling for industrial applications
US10305781B2 · kind B2 · utility
Assignee
Inventor
Key dates
| Filing date | Aug 18, 2016 |
| Grant date | May 28, 2019 |
| Priority date | — |
| Expiry date | Nov 27, 2036 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04W84/18
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
Arrangements described herein implement a CONtent CentrIc cross-layer SchEduling (CONCISE) approach in which content specific routes and schedules are created, resulting in an overlaid routing structure and multiple content based schedules. In CONCISE, not only is non-conflict multi-hop scheduling implemented but also data aggregation along the routing path is taken into account during the scheduling process. This therefore provides a new way to route and aggregate data in a deterministic and timely manner via scheduling.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.