Methods of controlling well bashing
US10309207B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 2, 2015 |
| Grant date | Jun 4, 2019 |
| Priority date | — |
| Expiry date | Oct 2, 2035 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B43/267
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
Methods of preventing or minimizing communication between adjacent wells include providing a treatment fluid including a conformance chemical, a diverting agent, and a hydraulic cement, introducing the treatment fluid into a first well adjacent a second well, allowing the conformance chemical, the diverting agent, and the hydraulic cement to block fractures in the first well to prevent or minimize communication between the first well and the second well, stimulating the second well after blocking the fractures, and recovering a formation fluid from the first well, the second well, or both.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.