Patent · US Active

Method of estimating well productivity along a section of a wellbore

US10353112B2 · kind B2 · utility

1Cited by
0References
16Claims
0Family size

Assignee

Inventor

Key dates

Filing dateJun 4, 2015
Grant dateJul 16, 2019
Priority date
Expiry dateJun 4, 2035

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F30/20
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

Disclosed is a system and a method of estimating a well inflow profile along a section of a wellbore of a well passing through a formation. The method comprises: collecting field data as a function of time during testing of the well, analyzing the collected field data to obtain selected field parameters, providing a created dynamic simulation model of the well inflow profile of the well based on at least the geometry of the well, defining a number of different possible inflow profile scenarios, simulating the defined inflow profile scenarios by means of the dynamic simulation model, analyzing the simulated inflow profile scenarios to obtain characteristics of intermittent or slug flow behavior in the form of selected modelling parameters as a function of time, comparing the selected modelling parameters as a function of time for each inflow profile scenario to the corresponding selected field parameters as a function of time and identifying the most likely inflow profile scenario on the basis thereof, and estimating the well inflow profile along the section of the wellbore based on the comparison of the selected modelling parameters as a function of time to the corresponding select…

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.