Managing risk in multi-node automation of endpoint management
US10361927B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 30, 2014 |
| Grant date | Jul 23, 2019 |
| Priority date | — |
| Expiry date | Sep 30, 2034 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/3442
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
It is determined whether a user is authorized to carry out a management operation on a plurality of information technology assets in parallel, based on a role of the user and at least one characteristic of the management operation. A risk level of the management operation, and at least one characteristic of the plurality of information technology assets, are both determined. Based on the risk level and the at least one characteristic of the plurality of information technology assets, an execution pattern for the management operation is specified. In at least some cases, the management operation is carried out on the plurality of information technology assets in parallel, in accordance with the execution pattern.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.