Method of placing sealant into an offshore well to abandon a production zone
US10378306B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 31, 2018 |
| Grant date | Aug 13, 2019 |
| Priority date | — |
| Expiry date | Oct 31, 2038 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B33/138
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A method of sealing a well includes selecting a preexisting fluid pathway between a production platform and a desired sealing location in the well to be sealed, determining, for the well to be sealed, a desired quantity of sealant having known flow qualities, to be delivered in fluid form to the well in the sealing region of the well, determining, based on the flow qualities of the sealant in fluid form and the flow qualities of the preexisting fluid pathway, the time needed to deliver the desired quantity of the sealant in fluid form to the sealing location in the well, determining, based on the time needed to deliver the desired quantity of the sealant in fluid form to the sealing location in the well, whether the sealant will maintain the fluid form, if necessary, change one or more qualities of the sealant so that the desired quantity of the sealant will reach the sealing location in the well while in the fluid form, and transport the quantity of sealant, in fluid form, through the preexisting fluid pathway between a production platform and the desired sealing location in the well to be sealed.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.