Patent · US Active

Method for realizing centralized control platform for large fully-mechanized coal mining face equipment

US10378352B2 · kind B2 · utility

1Cited by
3References
3Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 1, 2016
Grant dateAug 13, 2019
Priority date
Expiry dateJun 1, 2036

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG05B2219/2616
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for realizing a centralized control platform for large fully-mechanized coal mining face equipment is provided. In the method, on the basis of a coal cutter system, a hydraulic support system, a coal mining face transportation system, an emulsion pump station system, a mobile transformer substation system and a video monitoring system of the large fully-mechanized coal mining face equipment, real-time monitoring, centralized coordination control and information communication network are realized by a high-speed embedded computer UNO-3072A, a high-speed data acquisition card PCI-1716, a PowerBuilder front-end development platform, an SQLServer database, a Modbus TCP/IP communication protocol and an industrial Ethernet, thereby realizing centralized control over the large underground fully-mechanized coal mining face equipment. Automated production of fully-mechanized coal mining faces is realized.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.