Interactive approach for managing risk and transparency
US10380528B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 27, 2015 |
| Grant date | Aug 13, 2019 |
| Priority date | — |
| Expiry date | Sep 12, 2037 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06393
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A network interface accesses project data, wherein the project data comprises a metric for a project. A processor determines a project completeness based on the project data. The network interface receives a project assessment and also accesses updated project data, wherein the updated project data comprises an updated metric for the project. The processor then determines an updated completeness of the project, and determines a change in the completeness of the project. When the change in the completeness of the project is over a threshold, the processor sets a material change flag. The processor also determines a low-granularity project status. The processor then generates a project heat map. The project heat map is displayed in a tabular format. The project heat map presents the completeness of the project, material change flag, and the low-granularity project status for the project simultaneously.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.