Patent · US Active

Completions index analysis

US10385686B2 · kind B2 · utility

4Cited by
8References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 28, 2014
Grant dateAug 20, 2019
Priority date
Expiry dateMar 15, 2036

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/26
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for determining a hydrocarbon-bearing reservoir quality prior to a hydraulic fracture treatment based on completions index is disclosed. The method comprises a step performing a test determining a hydraulic pressure at which a hydrocarbon-bearing reservoir will begin to fracture by pumping a fluid in a wellbore, wherein the wellbore extends from a surface to the reservoir and the wellbore has one or more perforations in communication with reservoir; a step generating a pressure transient in the wellbore, the pressure transient travels from the surface to the reservoir through the perforations and reflects back the surface after contacting the reservoir; a step measuring response of the pressure transient at sufficiently high sampling frequency; a step determining fracture hydraulic parameters of the perforations and the reservoir using the measured response; and optimizing a stimulation treatment to the reservoir based on the determined fracture hydraulic parameters.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.