System and method for validating optimization of a wind farm
US10385829B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | May 11, 2016 |
| Grant date | Aug 20, 2019 |
| Priority date | — |
| Expiry date | Jun 11, 2037 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02E10/72
- WIPO fieldEngines, pumps, turbines
- WIPO sectorMechanical engineering
Abstract
The present disclosure is directed to systems and methods for generating one or more farm-level power curves for a wind farm that can be used to validate an upgrade provided to the wind farm. The method includes operating the wind farm in a first operational mode. Another step includes collecting turbine-level operational data from one or more of the wind turbines in the wind farm during the first operational mode. The method also includes aggregating the turbine-level operational data into a representative farm-level time-series. Another step includes analyzing the operational data collected during the first second operational mode. Thus, the method also includes generating one or more farm-level power curves for the first operational mode based on the analyzed operational data.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.