Patent · US Active

Predicting water holdup measurement accuracy of multiphase production logging tools

US10393916B2 · kind B2 · utility

1Cited by
0References
20Claims
0Family size

Assignees

Inventors

Key dates

Filing dateMar 15, 2016
Grant dateAug 27, 2019
Priority date
Expiry dateApr 12, 2037

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG01V20/00
  • WIPO fieldMeasurement
  • WIPO sectorInstruments

Abstract

In one possible implementation, a computer-readable tangible medium includes instructions that direct a processor to access one or more wellbore properties and a plurality of well fluid properties. Instructions are also present that direct the processor to access a distance between a proposed location of an inlet to a multiphase production logging tool and an emulsion generation location in a wellbore. Further instructions instruct the processor to predict a drop size distribution of emulsified water in the well fluid at the proposed location of the inlet to the multiphase production logging tool. Additional instructions instruct the processor to compute an estimated error in water holdup detected by the multiphase production logging tool based on the drop size distribution, and recommend deployment of a pulsed neutron logging tool in the wellbore when the estimated error in the water holdup is above a preset threshold.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.