Synchronization controller having function of solving shock generated in synchronization start block
US10394225B2 · kind B2 · utility
Assignee
Inventor
Key dates
| Filing date | Aug 2, 2016 |
| Grant date | Aug 27, 2019 |
| Priority date | — |
| Expiry date | Oct 30, 2037 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG05B2219/50234
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
In a synchronization operation instruction of a synchronization control of moving a slave axis at a certain ratio with respect to a master axis movement amount, a master axis movement amount before start of change of a synchronization magnification, used in an operation based on a synchronization magnification changing instruction, is determined by referring to a parameter of the synchronization operation instruction so that the operation based on the synchronization magnification changing instruction ends at a set synchronization start master axis position. With such a configuration, the synchronization control is started based on the synchronization operation instruction from the synchronization start master axis position set in the synchronization operation instruction.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.