Patent · US Active

Simulation system with clock and messaging synchronization

US10409321B2 · kind B2 · utility

0Cited by
10References
34Claims
0Family size

Assignee

Inventors

Key dates

Filing dateFeb 3, 2017
Grant dateSep 10, 2019
Priority date
Expiry dateSep 2, 2037

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F30/396
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A system includes a first simulated processing system having a first clock and a second simulated processing system having a second clock. The first and second processing systems may operate asynchronously. A synchronization bridge may coordinate executing of the first synchronized processing system and the second synchronized processing system to synchronize the time of execution of the first and second simulated processing systems and messaging between the first and second processing systems. The first and second processing systems may be simulated processing systems.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.