Patent · US Active

Production estimation in subterranean formations

US10428626B2 · kind B2 · utility

2Cited by
0References
5Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 17, 2011
Grant dateOct 1, 2019
Priority date
Expiry dateOct 17, 2031

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A system has a tool capable of obtaining data that characterizes a stimulated reservoir or from which the stimulated reservoir can be characterized. The system also includes a processor capable of predicting the production of the stimulated reservoir using the characterizing data and outputting the predicted production. A reservoir may be stimulated using a stimulation process and data may be obtained that characterizes the stimulated reservoir or from which the stimulated reservoir can be characterized. The production of the stimulated reservoir may be predicted using the data. Alternatively, a reservoir may be stimulated using a stimulation process and data that characterizes the stimulated reservoir or from which the stimulated reservoir can be characterized may be obtained. One or more 3-D volumes may be produced based on the characterizing data, and inferences about the stimulated reservoir may be made using the one or more 3-D volumes.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.