Patent · US Active

Task-based framework for synchronization of event handling between nodes in an active/active data storage system

US10445295B1 · kind B1 · utility

8Cited by
4References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJul 28, 2017
Grant dateOct 15, 2019
Priority date
Expiry dateMar 7, 2038

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F16/185
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Technology for synchronizing event handling between a primary storage processor and a secondary storage processor in an active/active data storage system. A single working task descriptor is selected at a time for uninterruptible execution, from a task scheduling queue that is maintained only on the primary storage processor. A copy of the working task descriptor is transmitted to the secondary storage processor. The working task descriptor is executed on both the primary storage processor and the secondary storage processor and without interruption by execution of any other task descriptor. Execution of the working task descriptor includes simultaneously transitioning through individual task states on both the primary storage processor and the secondary storage processor, and simultaneously executing functions on both the primary storage processor and the secondary storage processor during associated task states.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.