Proactive overload handling on real-time systems
US10448224B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Nov 20, 2018 |
| Grant date | Oct 15, 2019 |
| Priority date | — |
| Expiry date | Nov 20, 2038 |
Classification
- Technology area (CPC H)Electricity
- CPC primaryH04M15/8221
- WIPO fieldTelecommunications
- WIPO sectorElectrical engineering
Abstract
A network device stores overload handling criteria for a real-time credit management system of a wireless core network. The network device monitors for overload conditions based on the overload handling criteria and determines, based on the monitoring, that a potential overload condition exists. The network device receives a first credit control request for a user device, determines a standard resource quota that is responsive to the first credit control request, and allocates an increased resource quota, over the standard resource quota, for the first credit control request. The increased resource quota is based on the potential overload condition and the overload handling criteria. The increased resource quota may prevent the system from reaching a complete overload condition, may reduce overall message traffic, and may provide time for manual or autonomous recovery from the circumstance that caused the potential overload condition.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.