Patent · US Active

Producing hydrocarbons from a formation

US10458215B2 · kind B2 · utility

0Cited by
3References
19Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJan 27, 2014
Grant dateOct 29, 2019
Priority date
Expiry dateJan 8, 2035

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B47/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for drilling a wellbore in the formation, wherein the wellbore is approximately horizontal; forming two or more fractures in the formation from the wellbore; receiving fracture performance data about the two or more fractures; analyzing the fracture performance data; selecting one or more fractures for injection and selecting one or more fractures for production based on the analysis of the fracture performance data; and completing the wellbore such that injection into the one or more fractures selected for injection and production from the one or more fractures selected for production may occur simultaneously.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.