Maintenance optimization for asset performance management
US10466689B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Apr 3, 2017 |
| Grant date | Nov 5, 2019 |
| Priority date | — |
| Expiry date | Dec 23, 2037 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/80
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
A computer implemented method comprising receiving one or more predictive maintenance models each defining a time-based probability of failure for one or more components, receiving current performance data for the components, defining a failure function for each component from a predictive maintenance model for the component and the current performance data for the component, the failure function defining the probability of failure of the component in each of a set of time periods, defining a value loss function for each component from the failure function for the component and a time-based component cost, the value loss function defining the expected value loss due to a planned replacement of the component in a given time period before the component fails or reaches its scheduled end-of-life, receiving data defining one or more factors that have an impact on the cost of a maintenance option.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.