Patent · US Active

Distributed node intra-group task scheduling method and system

US10474504B2 · kind B2 · utility

0Cited by
8References
8Claims
0Family size

Assignees

Inventors

Key dates

Filing dateMar 12, 2015
Grant dateNov 12, 2019
Priority date
Expiry dateNov 9, 2035

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/5066
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A distributed node intra-group task scheduling method includes: step 101) collecting resource state information and history service information about each node in a group; step 102) receiving a service request command and parsing the request command to obtain a request task; step 103) according to the resource state information and history service information about each node, calculating the resource utilization rate increment after each node in the group loads a task and the occupation condition of each kind of resource in the group; and according to a principle of making the resource utilization rate increment of each node in the group as low as possible and the occupation of each kind of resource in the group as balanced as possible, selecting service execution nodes in the group, and providing the request task by the selected service execution nodes.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.