Patent · US Active

Systems and methods for producing gas wells with multiple production tubing strings

US10487633B2 · kind B2 · utility

1Cited by
13References
16Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 11, 2017
Grant dateNov 26, 2019
Priority date
Expiry dateSep 28, 2037

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/13
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A system for producing hydrocarbons from a subterranean well including a wellbore extending from a surface into a subterranean formation includes a wellhead disposed at the surface. In addition, the system includes a production tree coupled to the wellhead and a casing coupled to the wellhead and extending into the wellbore. Still further, the system includes a first production tubing string extending into the casing from the wellhead to a first production zone and a second production tubing string extending into the casing from the wellhead to the first production zone. The first production tubing string and the second production tubing string are each configured to provide a fluid flow path for gases from the first production zone. The second production tubing string is radially spaced from the first production tubing string. The first production tubing string has an inner diameter D1 that is larger than an inner diameter D2 of the second production tubing string.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.