Patent · US Active

Selection of maintenance tasks

US10489189B2 · kind B2 · utility

0Cited by
1References
15Claims
0Family size

Assignee

Inventors

Key dates

Filing dateFeb 17, 2017
Grant dateNov 26, 2019
Priority date
Expiry dateJun 10, 2037

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2209/508
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A computer-implemented mechanism is provided that monitors usage of one or more computing resources within a set of computing components relative to a received workload. The mechanism calculates a maximum workload for the set of computing components from the monitored use of the computing resources within the set of computing components and determines an available overhead between the calculated maximum workload for the set of computing components and a current workload being performed by the set of computing components. The mechanism selects one or more maintenance tasks for the set of computing components, the total workload of the selected maintenance tasks being less than the determined available overhead.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.